Vladimira Popovića 6, Novi Beograd
Vladimira Popovića 6, Novi Beograd
Who are we looking for?
✓ A strategic partner with experience in developing and operating large solar photovoltaic projects
✓ We want to invest in Serbia
Main Project: Solar Power Plant "Mali Izvor"
Location: KO Mali Izvor, City of Zaječar
Area: ~75 hectares
Installed Capacity: 50 MW AC / 65 MW DC
Annual Production: approx. 92,000 MWh
Infrastructure: solar field, 6.5 km transmission line,
substation and distribution facility
Planned Start of Construction: Q3 2026
Completion and Commissioning (trial operation): June 2027
We are a private company dedicated to the development and implementation of infrastructure projects in the field of renewable energy, with a focus on solar power.